Paint

As a finishing touch to the airing cupboard, I gave it a coat of paint. It seems like big step to start getting paint on the walls, as though we are nearing the end! However its just one little room..

painted airing cupboard

I did some more plastering this weekend, in the bathroom where the bath is going to go. It feels like I’m starting to get the hang of plastering. Still not 100% but its getting better.  I needed to get that done so I could run some pipes along it. I didn’t finish all the plumbing I had planned but I got enough done so that the boiler installation has enough pipes to link to. We are splitting the heating circuit into 3, old house, new barn, and bathrooms. This means lots of pipes connecting though to the old part of the house. The installation of the boiler might happen next week, but last time we spoke the man was waiting for the last bit (tanks), so we’ll have to see.

This entry was posted in Building. Bookmark the permalink.