Arfon came up to help on the barn this weekend. We got loads done; finished off the plumbing linking the new hot water pipes into the old system (with a valve so it doesn’t flood the barn), and put up the stud walls for one of the bedrooms.
And just after Arfon left the boiler man rang to say he is coming tomorrow to start installing the solar hot water cylinder and the boiler.
Soon be having guests to stay at this rate:)