New Roof

The roofers have been doing a grand job ( and they have a great name: Vertigo !), they have finished the front and are part done at the rear but they had to stop to wait for the solar panels to be installed (should be Tuesday). Inside they have poured the final concrete and have started putting down the base plates for the internal frame that insulates the walls and is the structural support for the first floor.

This entry was posted in Building. Bookmark the permalink.

Comments are closed.