I’ve taken some time off work, so that I can do some work on the barn. I’ve got three weeks to do stuff, and I sort of have a plan:
- Passage to work room – needs a floor and painting, and possibly some bookshelves / cupboards,
- upstairs corridor – I want to get it plasterboarded so you can get to the spare room,
- spare room – needs painting / a floor / shutters,
- walls – the bathroom and other rooms are still missing some walls!
After the first week – I have got the floor done in the passage, and hung the door. It still needs painting, and tiles – if we could decide on what we wanted!
The work on the floor was powered by a box of chocolates!
Nearly ready for visitors:)
thats the plan…